A K-TEK SOLUTION

RAPID reusable 90-degree pipe elbow insulation jacket metal jacketed industrial
RAPID straight pipe reusable insulation cover modular industrial piping system
RAPID removable flange insulation jacket quick-release latch design
RAPID pipe reducer reusable insulation cover pre-engineered industrial fitting
RAPID straight tee pipe insulation jacket modular reusable power plant
RAPID valve insulation jacket removable reusable metal-jacketed industrial valve cover

Combined Cycle Power Plant High Pressure Bypass Piping

Annual inspections and frequent weld repairs on a P91-to-A106B transition spool of the HP bypass piping required full insulation and jacketing removal and replacement, adding material costs and at least two days of downtime per event. To eliminate this recurring burden, RAPID was designed for approximately 33 feet of 18-inch, 1000°F piping to enable fast removal and reinstallation during future inspections and weld repair work. After RAPID implementation, insulation installation time dropped by 94% and annual insulation replacement costs were reduced by nearly 100% due to reusability.

img_5389
Read More
case_study_cross_over_piping
Read More